Structural CA seismic
Rated to 210 ft · 21 stories
One steel chassis, low-rise to high-rise
Chassis Steel volumetric
Patented mechanical lock, module to module
Hover to see every volumetric module inside
On site Construction
Targeting 90%+ finished building delivered to every site
Stacked in under two weeks
See inside the unit

Factory-built housing, at scale · San Diego, CA

The next generation of housing: factory-built, precision-engineered, operated as one system.

Domo designs, manufactures, constructs and operates steel modular buildings through one vertically integrated company.

San Diego · Domo steel modular tower, rendering
San Diego pipeline
~1,100 units permitted · 8 projects
Factory capacity
1,000+ units per year, scaling to 4,000
Site assembly
Stacked in under 2 weeks
Transport
Permitted loads, no flaggers or follow cars

In production, permitted and operating. Not a concept.

Status · October 2026
San DiegoPermitted
1,100units

Across 8 projects under development, and growing.

FactoryDesigned
1,000+ per year

San Diego line, with a roadmap to 4,000 units per year.

SiteStacking
<2weeks

A 60-unit building, crane-set and locked with the patented connection.

StructureCA seismic
210ft

About 21 stories on a single steel volumetric chassis.

Completed Domo building at 3743 4th Avenue, Hillcrest, San Diego
Built · In lease-up

3743 4th Avenue, Hillcrest

Domo's first San Diego community. Stacked from factory-finished modules in under two weeks, now in lease-up and operated by Domo Living.

Residences
60 units
Modules
78 steel volumes
Set time
Under 2 weeks
Rendering of Domo's second San Diego community on Riley Street, an eight-story building with rooftop solar
In production

Riley Street, San Diego

Domo's second community is on the line now: residence, stair, elevator and pool modules built as one sequenced stack.

Residences
135 dwelling units
Modules
172, including stair, elevator and pool volumes
Status
Modules in production

Most modular companies struggled on the business model, not the factory. Domo owns the whole chain: design, manufacturing, construction and operations, each feeding the next.

Why Domo is different

One company. Four divisions. A closed feedback loop.

Every building Domo operates teaches the next one Domo designs. Field data from construction and operations flows back through the Domo Brain, Domo's in-house enterprise AI, into the chassis, the factory line and the next site. That loop is what bends the cost curve. Hover a division, or the Brain at the center, to see what moves through it.

The Domo Brain is the data moat.

Every building built, every module produced, every consultant hired and every project meeting runs through the Domo Brain: an in-house, enterprise-level AI that consumes the data from all four divisions, structures it and returns it as decisions. It is how Domo enhances the product, operates the buildings, drives cost down and scales.

In-house enterprise AI

Faster, and below conventional multifamily cost.

Moving nearly all of the building into the factory does more than save weeks. It removes the parts of construction that generate change orders and overruns, so Domo delivers buildings below the cost of conventional multifamily, with a schedule that can be underwritten.

Schedule

Factory and site run in parallel

Modules are built while foundations and utilities go in. The building arrives finished and is stacked in under two weeks instead of framed, roughed and finished floor by floor in the weather.

Cost

Standard parts, repeated

One chassis, one bill of materials and one line sequence across every project. Volume purchasing and a trained crew in a controlled plant replace one-off field labor.

Risk

Fewer change orders

The design is frozen before the first weld. Quality is checked per module on the line, not discovered on a punch list, so overruns and rework shrink with them.

What stays on site

Foundations and utilities. Crane setting and locking. Unit-to-unit MEP connections. Final punch-out. Nearly everything else, from structure to kitchens to furnishings, is finished before the module leaves the factory, and the V3 module brings the exterior skin with it.

Roadmap

San Diego first. Then the Southwest.

Domo clusters projects in a city so one factory, one crew and one operations team serve many buildings. About 1,100 units are permitted across eight San Diego projects today. The same playbook extends to Arizona, Nevada, New Mexico, Colorado and Texas.

San Diego projects
8
Units permitted
~1,100
Factory target
4,000 / yr
Next markets
AZ · NV · NM · CO · TX
San Diego Phoenix Las Vegas Albuquerque Denver Austin Dallas CA NV AZ NM CO TX

Learn more about Domo:

Short answers. The full detail is on each division page.

What does Domo Modular actually build?

Multifamily buildings made of factory-built steel volumetric modules: complete, finished rooms that are trucked to the site, crane-set and locked together. The same standard chassis configures into market-rate, affordable, workforce, student and senior housing, and hospitality.

How is Domo different from modular companies that struggled?

Domo does not sell modules into someone else's process. It designs, manufactures, constructs and operates its own buildings, so the design, the factory line, the site crew and the operations team share one data loop and one incentive. Each building makes the next one cheaper and faster.

How tall can a Domo building go?

The steel chassis is rated in California seismic zones to 210 feet, about 21 stories. The same system serves low-rise, mid-rise and high-rise projects.

How long does on-site construction take?

Foundations and utilities are built while the modules are manufactured. A 60-unit building was stacked in under two weeks. On-site scope is limited to foundations, crane setting and locking, unit-to-unit MEP connections and final punch-out, with Domo targeting 90%+ of the building finished before it reaches the site.

Where is Domo building today, and where next?

San Diego, California: about 1,100 permitted units across eight projects, with one community built and in lease-up and a second in production. The roadmap extends across the Southwest: Arizona, Nevada, New Mexico, Colorado and Texas.

How do modules travel to the site?

On standard flatbed trucks. Modules ship as permitted loads, with no flaggers or follow cars required, and loads are sequenced to the order the crane needs them.

Who operates the buildings after they open?

Domo Living, Domo's property management and operations division, on Domo's own software stack: leasing, payments, access control, smart home, maintenance and an AI concierge in one resident app, with hospitality-level service on site.

Work with Domo

Building the housing system the next decade needs.

Domo is in production, permitted and operating in San Diego, and expanding across the Southwest.